• Downtown Historic Courthouse Square — Monroe, WI c. 1949

    Following World War II, the City of Monroe reconstructed its Downtown Historic Courthouse Square, honoring those who had served in the war and extending municipal water main and sanitary sewer utilities to businesses and residences around the Square.
  • Delafield-Hartland Wastewater Treatment Plant — Delafield, WI c. 1982

    Because of recent relevant experience and impartiality with the communities served, we were able to restart a languishing facilities plan and successfully design and usher through construction this regional WWTP and 3 miles of collection system. This project won the 1982 ACEC Engineering Excellence Award.
  • Sub-Zero Westye F. Bakke Training Center — Fitchburg, WI c. 2001

    For Sub-Zero Freezer Group, Inc., a manufacturer of luxury major kitchen appliances, we provided structural engineering design services for the stunning Westye F. Bakke Center that incorporates training and entertaining facilities, auditorium for product presentation, a dining area, pub, lounge, and several ‘Living Kitchens’ showcasing Sub-Zero’s appliances.
  • Interstate Open Road Tolling (ORT) Plazas — Dixon and DeKalb, IL c. 2006

    ORT facilities provide free-flow traffic through toll collection areas by using a transponder – the first of its kind in the nation! We provided design of roadway, structural, architectural, drainage, and electronic toll collection infrastructure to convert two toll plazas along I-88 to ORT.
  • People Trail Bridge — Columbus, IN c. 2018

    Extension of the People Trail between 25th Street and Lincoln Park in Columbus completes a vital link in the city trail system. Users now continue south and cross Haw Creek over a 107-year-old historic steel truss bridge relocated from a bridge replacement project in eastern Bartholomew County.
  • Grand Crossing Park — Monona, WI c. 2019

    Located at the confluence of the Yahara River and Lake Monona, the City of Monona hired us to develop a riverfront park with a permanent dock on the river, an entertainment stage, large green space that hosts an ice rink in the winter, and a lighted, ADA-friendly multiuse pathway.
  • J Avenue Water Treatment Plant (WTP) — Cedar Rapids, IA c. 2020

    The J Avenue WTP marks our largest and most complex WTP project in Iowa to date. Improvements include upgrades to Softener and Clarifier No. 3 and the addition of sludge pumps, a batch lime feed system, a centrifuge dewatering system, a carbonic acid feed system, and raw water main.

Strand Associates, Inc.