Our firm provided full engineering services, including plan development, design, and construction-phase services for Phases I, II, and III of a 150-acre park complex for the City of College Station. This project consisted of new softball fields, soccer fields, parking lots, utilities, fencing, sidewalks, field lighting, and building construction. Sand-based root zones with Tifway Bermuda turf systems were installed throughout the park and measures were taken to control erosion and sedimentation. An irrigation system was also installed.

Back to Project Gallery