Roundabout– Design and Construction

View our Roundabout Expertise
 


Studies and Planning


Peer Reviews



 

Design AND CONSTRUCTION
We have designed roundabout projects for states, counties, local municipalities and developers for the past several years.  Our experience includes everything from single lane roundabouts in residential developments to multilane roundabouts in complex urban corridors.  We also provide construction services for roundabout projects. 

 

Described below are a sampling of our design/construction roundabout projects.

 


STH 35 Interchange project – Hudson, wi

The STH 35 interchange project converted an existing at-grade intersection into a grade-separated interchange with multilane roundabout ramp terminals. This was the first full-diamond interchange utilizing roundabouts at the ramp terminals in the state of Wisconsin. We prepared the contract drawings and assisted in the design of the ramp terminal roundabouts. We also modeled the interchange using Paramics simulation software to provide an illustration of interchange operations during public involvement meetings. Extensive coordination with local officials and the public was included to educate residents about the roundabouts and to incorporate the interchange into this rapidly developing area. Additional services provided include right-of-way plat, multi-use path, stormwater modeling and detention basin design, and lighting.

 

 

highway 12 BYPASS PROJECT - SAUK Co. WI

The US 12 Bypass project will construct a relocated freeway approximately a quarter to one-half mile west of the existing alignment. The project involves constructing 6 miles of a four-lane relocated freeway from IH 90/94 to the existing four-lane section of Highway 12 just north of Baraboo. The corridor will carry nearly 40,000 vehicles per day. The project includes three interchanges: at CTH BD, North Reedsburg Road, and Highway 33.    Roundabouts will be utilized extensively on the corridor, with a total of ten planned at various locations, including the interchange ramp terminals.    Construction is planned for the years 2009-2011.  The total cost of this project is estimated to be approximately $60 million.  Services provided include right-of-way plat, stormwater modeling and detention basin design, lighting, and extensive public involvement.

 

 

Dekalb county, il

We were retained by Dekalb County for the design of two single-lane roundabouts at existing rural intersections that had high crash histories.  These projects included the design of high speed approaches to the roundabouts to slow traffic from 55 mph to 25 mph prior to the roundabout.  We worked closely with the county to assist with the landscaping and lighting layouts of these roundabouts to promote adequate sight lines at all high speed approaches. 

  

 

Cth id corridor - mount horeb, wi

We were retained by the Village of Mount Horeb for design of the rapidly developing CTH ID corridor. The project scope included a total of four multilane urban roundabouts in a 1.1-mile corridor between the US 18/151 interchange and Perimeter Street. We provided all design and construction engineering for the $3.5 million project. One of the most challenging elements of the project was the construction staging and traffic control planning required to build the project without road closures.  This was accomplished by building the roundabouts in quarters and halves, with traffic carefully staged during each construction phase.

 

The Village now has a unique and inviting main entry way to the community.

 

 

 

 